Barndominium Builders in Hollywood, FL
Hollywood's own zoning code settles the acreage question before it's even asked: the city's ten single-family districts run RS-1 through RS-10, there is no agricultural or rural-residential district anywhere in the roster, and even RS-10, the largest lot minimum in the city, tops out at 15,000 sq ft, 0.344 of an acre. The realistic Hollywood project is a compact steel-framed shouse or shop-house on a standard 40 to 100 ft city lot, not a rural build. If genuine acreage is the goal, Southwest Ranches and Davie, both a short drive west, and pockets of unincorporated Broward actually carry it; Hollywood, squeezed between Fort Lauderdale's urban core and the Miami-Dade line with no vacant land left to subdivide, does not.
Hollywood at a glance
- County
- Broward County
- Population
- 159,073
- Also serving in Broward County
- Fort Lauderdale, Pembroke Pines, Miramar, Coral Springs, Pompano Beach, Davie
Building conditions in Hollywood
What actually changes from one Florida city to the next: who issues the permit, what wind speed the structure has to be engineered to, and what the ground is like. These are the numbers your drawings have to satisfy.
City of Hollywood Zoning and Land Development Regulations, Article 4, via amlegal Code Library (codelibrary.amlegal.com/codes/hollywood/latest/hollywoodldr_fl), version 2025 S-51, current through Ordinance O-2025-07 (passed 7-2-25).
Florida Building Code 8th Edition (2023) § 1620, Risk Category II; § 202 HVHZ definition (Broward and Miami-Dade counties only, boundary is the county line). Applies to Hollywood countywide with no local carve-out.
FEMA 'CRS Eligible Communities' list, April 2025 effective-date edition, row: FL 125113 Hollywood, City of, Class 6, 20%. Each of Broward's 31 municipalities runs its own class; do not carry Fort Lauderdale's discount figure onto a Hollywood quote.
Tindale Oliver City of Hollywood Impact Fee Study, as published in the FY2026 Comprehensive Schedule of Fees, Resolution R-2025-2026 ('Master Impact Fee Schedule'). Whether Broward County layers a separate county-level impact fee on top of this city schedule, or the city fee fully substitutes inside city limits, we verify with Hollywood Development Services or Broward County Planning before quoting an all-in total.
City of Hollywood, 'Comprehensive Schedule of Fees,' Resolution R-2025-2026, Department of Development Services § Building. Statewide private-provider entitlement is F.S. 553.791.
US Census Building Permits Survey county files, 2024 and 2025. Broward County figures are used here as the best available benchmark for Hollywood's market size.
Also worth knowing before you build in Hollywood
- What the HVHZ demands of a metal building
- Roof and wall sheets must run 24 gauge minimum, against the 26 and 29 gauge the national kit market builds to, and a Florida-licensed engineer has to seal the site-specific adaptation, foundation, and anchorage as one system. Connections need a minimum 400 lb per linear foot of lateral resistance.
- Exposure Category C, no exceptions
- There's no Exposure B anywhere in the HVHZ, however sheltered a lot feels. A suburban Hollywood parcel tucked well inland of Hollywood Beach still gets engineered to Exposure C, which adds load the national kit market doesn't plan for.
- Who issues your permit
- City of Hollywood Building Division, Department of Development Services, handles it, not Broward County. Applications, review, payment, and inspection scheduling all run through the Accela Citizen Access portal. Development Services Hub, 2nd Floor, City Hall Circle, 2600 Hollywood Blvd.
- Permit review deadline applies with no HVHZ carve-out
- 30 business days for a single-family home under 7,500 sq ft, with a 10% permit-fee cut for every business day the city runs late. Being in the HVHZ doesn't buy Hollywood's building department extra time.
- Base permit fee stacks with a 25% processing fee
- New construction pays a tiered percentage of declared work value, 2.20% from $1,001 to $1,000,000, dropping to 1.65% and then 1.15% at higher tiers, plus a separate, non-refundable processing fee equal to 25% of the estimated job cost. On top of that: 3% combined state surcharge, a Broward County surcharge of $0.52 per $1,000 of value, a 2% technology fee, and a 1% educational fee.
- Utility capacity fees, separate from impact and permit fees
- A new single-family water and sewer connection runs $3,260 (sewer reserve capacity $2,130 plus water reserve capacity $1,130), plus $150 in deposits, plus tapping and meter-installation charges that run $1,349 plus $531 for a standard 5/8" meter.
- A shop or workshop accessory structure is a use-compatibility review, not a size cap
- Decks, pools, sheds, and similar accessory uses are allowed as-of-right if customarily associated with a single-family home; anything else, including a dedicated workshop, needs Planning Director approval against a compatibility test rather than hitting a hard size limit. Hollywood has not published a standalone ADU ordinance under the state's 2023 ADU-authorization statute.
- A second kitchen effectively can't become a rental unit
- Hollywood allows a second kitchen or in-law suite only with Planning Director approval, on a floor plan of at least 3,600 sq ft excluding garage, with a single electric and water meter, no exterior doorway, and a recorded covenant against renting the space. It's a real option for multigenerational living, not a path to a legal duplex.
- Rainfall, from Hollywood's own weather station
- 61.98 inches a year at Hollywood North Perry Airport, Hollywood's own NOAA station rather than a borrowed regional figure, distinct from the Fort Lauderdale-Hollywood International reading a few miles north. Roof drainage and site grading get designed for that number.
- Hurricane exposure, measured nearby
- Hollywood North Perry Airport's own control tower and roof took damage during Hurricane Wilma (2005). The best documented wind figures for the area are Fort Lauderdale's: 70 mph sustained, 99 mph gust, with the National Hurricane Service noting Broward's monitoring stations likely under-recorded near their peak readings. The code still requires design to 170 mph, well above what Wilma delivered.
- Boxed in on both flanks
- Hollywood sits on the Atlantic coast directly between Fort Lauderdale's urban core to the north and the Miami-Dade County line a few miles to its south, with no vacant land reserve on either side to absorb acreage-style development. That geography, not just the zoning code, is why the city's largest single-family lot tops out at 0.344 of an acre.
FBC § 2223.8.4, § 2223.8.5, § 2222.4.3, § 2223.5. Applies to Hollywood exactly, since the HVHZ boundary is the county line and Hollywood has no partial exemption.
FBC § 1620.3.
hollywoodfl.org/328/Building, phone 954-921-3335 option 1.
F.S. 553.792, applying to Hollywood exactly as it does statewide, no local exception found.
City of Hollywood, 'Comprehensive Schedule of Fees,' Resolution R-2025-2026.
City of Hollywood FY2026 Comprehensive Schedule of Fees, Development Services.
Hollywood ZLDR § 4.1.E, current through Ordinance O-2025-07.
Hollywood ZLDR § 4.1, single-family district regulations.
NOAA NCEI 1991-2020 U.S. Climate Normals, station USW00092809 (Hollywood North Perry Airport), queried directly against the NCEI API.
NOAA National Hurricane Center Tropical Cyclone Report, Hurricane Wilma (2005). Fort Lauderdale figures are used here as the best documented benchmark for the area.
U.S. Census Bureau QuickFacts, Hollywood city, Florida; City of Hollywood ZLDR Article 4. Land area 27.27-27.3 sq mi.
The expensive surprises are in the ground, not the building
Most of Broward County rates poorly for dwellings in the soil survey, and the reason is water sitting close to the surface rather than weak ground. That makes the pad elevation and the drainage plan the two line items most likely to move your budget. We price the dirt before we price the building.
What we build in Hollywood
Every service we offer is available across Broward County, from a shell kit you erect yourself to a finished home we hand you the keys to. What a build costs depends far more on the parcel than on square footage, so we price against your land rather than publishing a rate card.
See all nine servicesWhat a build looks like
Three stages every Hollywood project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.
The parcel
Zoning, setbacks, flood zone and utility access get checked before anything is drawn.
Pad and permit
Clearing, grading and a compacted pad, while the submittal works through Broward County.
Frame to finish
Shell erected and dried in, then systems, insulation and interior finish through to CO.
Those are the rules for Broward County. Tell us what you want to build and we will draw it to them.
Where we build around Hollywood
Broward County and the rural land around it. The buildable acreage for a project this size usually sits outside the city limits, which is frequently what changes who issues your permit.
Keep reading
The questions that usually come next once you know what Hollywood allows.
Is It Legal in Florida?
Classification, zoning, and what the High Velocity Hurricane Zone actually requires in Broward County.
Read itBarndominium Cost Guide
Sourced ranges by tier, plus the Florida adders that land on top of a national average.
Read itHow Long Does It Take?
Census build-duration data, and the Florida statute capping permit review at 30 business days.
Read itSources for this page
The primary documents behind the Hollywood figures above. We would rather you checked them than took our word for it.
- Broward County Code of OrdinancesZoning districts, minimum lot sizes, setbacks and height limits, as adopted.library.municode.com
- Broward County Building DepartmentThe authority that reviews and issues the permit for unincorporated parcels.broward.org
- Florida Statute 553.792The 30-business-day permit review clock, and the 10% fee reduction per day a jurisdiction runs late.flsenate.gov
- Florida Building CodeThe adopted code itself, including the wind-speed figures and the High Velocity Hurricane Zone definition.floridabuilding.org
- ASCE 7 Hazard ToolLook up the ultimate design wind speed at a specific address rather than reading it off a contour map.asce7hazardtool.online
Nearby areas we build in
Close to Hollywood, though the permitting authority and wind requirements can differ once you cross a county line.
Building in Hollywood: common questions
9 questions we get asked most often about building in Hollywood. If yours is not on the list, ask it directly.
Can I build a barndominium on acreage in Hollywood?
What wind speed does my building have to be engineered to?
Will a stock metal building kit from out of state work here?
Who issues my building permit, the city or the county?
How long does permit review take, and does being in the HVHZ slow it down?
What are the impact fees for a new single-family home in Hollywood?
Is there a discount for using a private provider instead of city plan review?
What's the flood insurance situation in Hollywood?
Can I build a shop with living quarters attached instead of a standalone house?
Building in Hollywood?
Start with the plan. Tell us what you want to build and we will draw it, then confirm what Broward County will actually let you put on the parcel and what wind load it has to meet. That conversation costs nothing.