Broward is one of only two counties in Florida inside the High Velocity Hurricane Zone, and that changes almost everything about how a metal building gets designed, approved and priced here. It also has very little land left. Broward authorised 730 single-family homes in all of 2025 across a county of two million people, and the parcels that suit a barndominium sit almost entirely in Davie and Southwest Ranches.
Fort Lauderdale at a glance
- County
- Broward County
- Population
- 190,641
- Also serving in Broward County
- Pembroke Pines, Hollywood, Miramar, Coral Springs, Pompano Beach, Davie
Building conditions in Fort Lauderdale
What actually changes from one Florida city to the next: who issues the permit, what wind speed the structure has to be engineered to, and what the ground is like. These are the numbers your drawings have to satisfy.
Florida Building Code 8th Edition (2023) § 1620, Risk Category II. Note 175 mph is Miami-Dade, not Broward; the two are routinely confused.
Florida Building Code 8th Edition (2023), Section 202 definition.
FBC § 2223.8.4, § 2223.8.5, § 2222.4.3 and § 2223.5. This is why most stock out-of-state building packages cannot legally be erected in Broward.
FBC § 1620.3. Rarely mentioned and quietly expensive.
US Census Vintage 2024 subcounty estimates. Broward also has a Board of Rules and Appeals whose code interpretations bind countywide, which no other Florida county has.
Southwest Ranches Land Development Code Article 45; Town of Davie zoning code Sec. 12-21. Verify dimensional standards against the official codes before you buy.
Also worth knowing before you build in Fort Lauderdale
- Product approval: both are accepted
- You do not need a Miami-Dade Notice of Acceptance. A statewide Florida Product Approval carrying HVHZ approval is equally valid in Broward, because state law bars a local jurisdiction from demanding further evidence.
- Opening protection
- Required on every glazed opening countywide, but impact glass is not the only route. Approved shutters and coverings are a full alternative under the code, not a lesser option.
- The impact test, in plain terms
- A 9 lb wooden 2x4 fired at 50 ft per second, twice, then static pressure, then cyclic pressure loading with the impact damage still in the specimen. The cyclic stage is what makes it hard.
- Roofing approval works differently
- A metal roof needs product approval as a complete system, underlayment and accessories included. You cannot assemble an approved roof out of separately approved parts, which catches people out.
- This is not a volume market
- Broward authorised 730 single-family homes in 2025, just 26% of residential units, down from 36% the year before. Multifamily took 71%. Average declared value per single-family unit rose to $522,535.
- Permit review deadlines apply normally
- Being in the HVHZ does not buy the building department extra time. The 30 business day clock and the 10% per day fee reduction apply here exactly as they do inland, as does the private provider route.
- New in 2026: offsite construction as of right
- An offsite-constructed dwelling must now be permitted as of right in any zoning district that allows dwellings. For kit and prefabricated barndominiums that removes a zoning argument that used to stall projects.
- Check the covenants before the code
- County zoning contains no restriction on metal cladding for a dwelling. The binding constraint in South Florida is usually a recorded private covenant, and an HOA can no longer demand you pull a permit before it reviews your plans.
- Water table
- Within 10 to 12 inches of the surface for two to six months a year in the dominant soils. In drained areas it moves with the canal levels through solution holes in the limestone, so drainage here is a regional problem, not a site one.
- Hurricane exposure, measured
- Hurricane Wilma produced 70 mph sustained and a 99 mph gust at Fort Lauderdale in 2005, and the NHC judged parts of Broward saw Category 2 conditions. The code still requires design to 170 mph.
- Rainfall
- 62.18 inches a year, the wettest of any market we build in. Roof drainage and site grading get designed for that number rather than a Florida average.
- Flood insurance discount
- Fort Lauderdale holds a Community Rating System Class 7, worth 15% off National Flood Insurance Program premiums in AE, AO, AH and VE zones and 10% in Zone X.
F.S. 553.842, read in full: no HVHZ carve-out exists. Numerous vendor sites claim otherwise and are simply wrong. What matters is HVHZ-approved or not.
FBC § 1609.1.2. The whole county sits in the wind-borne debris region.
TAS 201, 202 and 203 in sequence; missile weight and speed from FBC § 1626.2. Large missile applies at or below 30 ft, so it applies to every barndominium.
FBC § 1518.9, plus RAS 133 as a mandatory HVHZ application standard. Minimum G-90 corrosion resistance, 26 gauge or thicker.
US Census Building Permits Survey county files, 2024 and 2025. A county of two million building 730 houses a year is a county that has run out of land.
F.S. 553.792 and F.S. 553.791, both read in full: no HVHZ, Broward or Miami-Dade exception exists.
F.S. 553.385, created by HB 803 (Ch. 2026-63), effective 1 July 2026.
Broward County Code Ch. 39 Art. XVI searched in full; F.S. 720.3035 as amended by HB 803. Each of the 31 cities has its own code too.
USDA NRCS Official Series Descriptions, Pompano and Margate series.
NOAA NHC tropical cyclone report for Wilma (2005). Several Broward stations stopped reporting at their peak values, so the measured figures understate the event.
NOAA NCEI 1991-2020 Climate Normals, Fort Lauderdale-Hollywood International.
City of Fort Lauderdale floodplain management. Each Broward city has its own class, so this figure does not transfer to neighbouring cities.
The expensive surprises are in the ground, not the building
Most of Broward County rates poorly for dwellings in the soil survey, and the reason is water sitting close to the surface rather than weak ground. That makes the pad elevation and the drainage plan the two line items most likely to move your budget. We price the dirt before we price the building.
What we build in Fort Lauderdale
Every service we offer is available across Broward County, from a shell kit you erect yourself to a finished home we hand you the keys to. What a build costs depends far more on the parcel than on square footage, so we price against your land rather than publishing a rate card.
See all nine servicesWhat a build looks like
Three stages every Fort Lauderdale project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.
The parcel
Zoning, setbacks, flood zone and utility access get checked before anything is drawn.
Pad and permit
Clearing, grading and a compacted pad, while the submittal works through Broward County.
Frame to finish
Shell erected and dried in, then systems, insulation and interior finish through to CO.
Those are the rules for Broward County. Tell us what you want to build and we will draw it to them.
Where we build around Fort Lauderdale
Broward County and the rural land around it. The buildable acreage for a project this size usually sits outside the city limits, which is frequently what changes who issues your permit.
Keep reading
The questions that usually come next once you know what Fort Lauderdale allows.
Is It Legal in Florida?
Classification, zoning, and what the High Velocity Hurricane Zone actually requires in Broward County.
Read itBarndominium Cost Guide
Sourced ranges by tier, plus the Florida adders that land on top of a national average.
Read itHow Long Does It Take?
Census build-duration data, and the Florida statute capping permit review at 30 business days.
Read itSources for this page
The primary documents behind the Fort Lauderdale figures above. We would rather you checked them than took our word for it.
- Broward County Code of OrdinancesZoning districts, minimum lot sizes, setbacks and height limits, as adopted.library.municode.com
- Broward County Building DepartmentThe authority that reviews and issues the permit for unincorporated parcels.broward.org
- Florida Statute 553.792The 30-business-day permit review clock, and the 10% fee reduction per day a jurisdiction runs late.flsenate.gov
- Florida Building CodeThe adopted code itself, including the wind-speed figures and the High Velocity Hurricane Zone definition.floridabuilding.org
- ASCE 7 Hazard ToolLook up the ultimate design wind speed at a specific address rather than reading it off a contour map.asce7hazardtool.online
Nearby areas we build in
Close to Fort Lauderdale, though the permitting authority and wind requirements can differ once you cross a county line.
Building in Fort Lauderdale: common questions
8 questions we get asked most often about building in Fort Lauderdale. If yours is not on the list, ask it directly.
What does the High Velocity Hurricane Zone actually require that the rest of Florida does not?
Do I need Miami-Dade approved products, or is Florida Product Approval enough?
Can I even build a barndominium in Broward County?
Will a kit I found online work here?
Do I have to have impact windows, or will shutters do?
Who issues my permit?
How much more does the HVHZ cost?
Will an HOA or deed restriction stop me?
Building in Fort Lauderdale?
Start with the plan. Tell us what you want to build and we will draw it, then confirm what Broward County will actually let you put on the parcel and what wind load it has to meet. That conversation costs nothing.